Operation Breakthrough Growth

Customer – JE Dunn Construction
Location – Kansas City, MO
Tonnage – 102 tons
Design Team – Clockwork 

Structural & miscellaneous steel for building expansion including box truss framing for pedestrian bridge, connecting buildings across the street from one another.  Box trusses were shop assembled and shipped in (2) pieces that were installed at night.